INTEGRATED FLOOD RESILIENCE & ADAPTATION PROJECT

Component 4 — Project Management, Technical Assistance, and Institutional Strengthening

As the foundation of the project, this component strengthens coordination, operational management, and capacity building. Led by the Federal Project Management Unit (FPMU), it drives collaboration between government, donors, and implementing units while ensuring effective execution of all components.

About the Component

Overview

Driving Coordination and Excellence in Project Execution

This component plays a critical role in ensuring the successful implementation of IFRAP by overseeing project execution, operational planning, and financial management. It provides strategic direction for all project activities, ensuring alignment with national policies and global best practices. Through robust monitoring and evaluation mechanisms, it upholds quality assurance, ensuring efficiency and transparency in project delivery. Additionally, it supports institutional capacity building, strengthens policy development, and fosters collaboration between government agencies, international partners, and community stakeholders. By serving as a central coordination hub, this component ensures streamlined operations and maximized impact across all project interventions.

Funding & Scope

Component Funding
$ 0 Million
IFRAP Components
0

Implementation Unit

Federal Project Management Unit (FPMU)

FPMU is instrumental in the success and sustainability of IFRAP. By consolidating expertise of project management, strategic coordination, quality assurance, policy development, institutional capacity building, and stakeholder engagement, FPMU serves as a knowledge hub for Project Implementation Units (PIUs), addressing technical challenges with the highest level of proficiency across all the components of IFRAP.

Key Roles

1. Quality Assurance

A cornerstone of FPMU’s role, ensuring rigorous monitoring and evaluation frameworks so that every phase of the project adheres to established standards and objectives. This oversight is vital for maintaining project integrity, maximizing effectiveness, and optimizing resource utilization.

2. Strategic Policy Development

FPMU plays a crucial role in shaping long-term strategies for water resource management and disaster resilience, contributing to frameworks such as the Water Act. This ensures both short-term project success and long-term sustainability.

3. Institutional Capacity Building

Through capacity-building workshops and training initiatives, FPMU enhances workforce skills, ensuring not only the effective implementation of the current project but also the development of a strong institutional foundation for future initiatives.

4. Multi-Level Coordination

FPMU facilitates coordination between different levels of government and international agencies, including the World Bank, ensuring that project goals align with both local priorities and global best practices.

5. Support for Project Steering Committees

FPMU provides strategic planning and decision-making support to the Project Steering Committees at federal and provincial levels, ensuring that each component and subcomponent is well-planned and aligned with overall project objectives.

Key Stats

Total Funding
$ 50 Million
Homes Reconstructed
0 +
Beneficiaries Supported
0 +
Districts Covered
0 +

Want to stay updated with IFRAP?

Follow us for all the latest news.

IFRAP Procurement Document
Document Viewer
Loading document…
IFRAP Procurement Document
Leasing of Office Premises for FPMU-IFRAP Sub-Office, Quetta (Balochistan)
RFQ No. 1(2) Admin/FPMU-Qta/Office/12/2025/03Issue Date 02 December 2025Submission Deadline 08 December 2025, 1:00 PM PSTValidity Minimum 60 days

1. Background and Objective

FPMU-IFRAP intends to establish a sub-office in Quetta, Balochistan to strengthen field coordination, monitoring, stakeholder engagement, and implementation support, consistent with the approved project arrangements and delegated powers. The premises will be used as a professional government project office.

2. Scope of Requirement

FPMU-IFRAP invites quotations from eligible property owners, authorized representatives/suppliers, and registered estate firms for providing office premises on lease in Quetta.

The selected premises will be leased initially for 3 years, extendable based on performance, need, and availability of funds, subject to applicable approvals.

3. Location Preference

Premises should be located in Chaman Housing, Quetta or adjacent suitable areas, with good road access, proximity to relevant government and provincial offices, a safe environment, reasonable commuting access for staff and visitors, and permission for office use.

4. Minimum Technical Requirements

A. Space and Layout

  • 4 to 6 rooms, including 1 conference/meeting room
  • Adequate washrooms for staff
  • Small pantry/kitchenette preferred
  • Adequate ventilation and natural light

B. Access, Parking and Security

  • Easy access for official visitors and staff
  • Parking for at least 2 to 3 cars preferred
  • Secure area with reasonable security environment
  • Boundary wall and controlled entry preferred where applicable

C. Utilities and Building Services

  • Functional electricity, water supply and sewerage
  • Provision for internet connectivity
  • Safe internal wiring and adequate electrical load capacity
  • Backup power is an advantage

D. Condition and Compliance

  • Ready and usable condition
  • Free from major structural defects and leakage
  • No ownership dispute or litigation affecting peaceful possession

5. Landlord / Provider Responsibilities

  • Provide premises in ready-to-occupy condition
  • Permit reasonable minor office arrangements
  • Support lease registration and stamp duty process under applicable law
  • Provide ownership/authorization and tax documentation as required

6. Key Commercial Terms to be Quoted

  • Monthly rent and annual rent total
  • Proposed payment schedule
  • Security deposit and refund terms
  • Stamp duty and registration estimate and cost responsibility
  • Property commission and cost responsibility
  • Utility inclusion/exclusion
  • Any proposed escalation clause
  • Confirmation of lease period and extension option

7. Inspection / Site Visit

FPMU-IFRAP may conduct a pre-award inspection of shortlisted premises. Only premises meeting mandatory requirements will be considered for financial evaluation.

8. Evaluation Method and Award

The contract will be awarded to the lowest evaluated, substantially responsive quotation among those meeting all mandatory technical requirements and providing complete documentation.

9. Eligibility and Required Documents

  • Proof of ownership or valid authorization from owner
  • CNIC of owner or authorized signatory
  • NTN/tax registration where applicable
  • Address, location pin/map and contact details
  • Latest utility bills
  • Declaration of no legal dispute affecting tenancy
  • Draft lease terms, if available, or acceptance of FPMU standard lease format

10. Quotation Submission Instructions

Quotation title: Quotation - Lease of Office Premises for FPMU-IFRAP Sub-Office, Quetta - RFQ No. 1(2) Admin/FPMU-Qta/Office/12/2025/03

Hard copy: FPMU Office, 7th Floor, EOBI House, G-10

Email: [email protected]

Late quotations may be rejected.

11. Right to Accept / Reject

FPMU-IFRAP reserves the right to accept or reject any or all quotations and to annul the process in accordance with applicable rules and project procedures.

12. Integrity, Conflict of Interest and Misrepresentation

Bidders must maintain high standards of integrity. Any misrepresentation regarding ownership, condition, costs, or conflict of interest may result in disqualification.

Issued by:
Manager (Admin), FPMU-IFRAP
Planning Commission, Islamabad
Contact: 034588850551

Annex A - Quotation Submission Form

Bidder Name, CNIC / NTN, Address, Contact Person & Mobile, Complete Address of Premises, Area / Locality, availability date, signature, name and date.

Annex B - Technical Compliance Checklist

  • 4 to 6 rooms including 1 conference room
  • Suitable reception/entry space
  • Adequate washrooms
  • Parking available
  • Secure area and safe access
  • Electricity and water functional
  • No leakage or major defects
  • No ownership dispute/litigation affecting tenancy
  • Internet service available in the area

Annex C - Price Schedule

Monthly Rent; Annual Rent (12 months); Security Deposit; Fit-out / Minor Adjustments; Stamp Duty and Registration; Property Commission; Utilities (inclusive/exclusive).

Grievance Reporting Form

Lodge your Complaint

 

You can use the contact form below or email us your grievance at [email protected]